You're contacting media contact of this press release
Title: NexMetals Hits Multiple 200-Meter Intercepts of High-Grade Mineralization at the Selkirk Project in Botswana
Vancouver, BC, September 25, 2025 – Global Stocks News – Sponsored content disseminated on behalf of NexMetals Mining. On September 23, 2025, NexMetals Mining (TSXV: NEXM) (NASDAQ: NEXM) released assay results from two additional holes in the 12-hole metallurgical drilling program at the Selkirk Mine in Botswana.Selkirk is a past-producing copper-nickel-cobalt-platinum group elements (Cu-Ni-Co-PGE) mine in Botswana. It is situated 28 kilometers south-east of the city of Francistown (pop. 103,000), and 75 kilometers north of NexMetals’ Selebi Mines.Since completing the acquisition of the Selkirk Mine in August 2022, NEXM has been focused on de-risking the project to support future development decisions.The 12-hole drill program wrapped up in August and was focused on collecting samples for metallurgical testing, validating legacy data and adding key data points to support a future resource model update.SMET-25-004 returned a wide interval of continuous mineralization: 210.00 metres of 1.06% CuEq (0.40% Cu, 0.36% Ni, 0.59 ppm Pd, 0.14 ppm Pt)incl. 74.00 metres of 1.28% CuEq (0.45% Cu, 0.46% Ni, 0.73 ppm Pd, 0.17 ppm Pt).Mineralization outside the Mineral Resource Estimate (MRE) and within the current conceptual pit shell demonstrated the potential for expansion of the deposit toward the surface: SMET-25-001: starting at 13.00 metres from surface, 45.00 metres of 0.69% CuEq (0.23% Cu, 0.23% Ni, 0.46 ppm Pd, 0.10 ppm Pt).The current cut-off of US$25.00 per tonne net smelter return defined in the MRE translates to 0.46% CuEq. Any material above this cut-off grade could be potentially mined."The results today, combined with last week's news of drill hole 003, highlight multiple intercepts over 200 metres of high-grade mineralization, once again exceeding our expect...
This press release is issued by King Newswire